After F1554 g55 studs manufactured by a competitor turned out to be shorter than required, AJAX held the shop open beyond regular hours to rectify the competitor’s mistake.
The swift action ensured the studs were ready and delivered to the customer’s site the following morning, just in time for the scheduled concrete pour.